Introduction

Many of tier 3 suppliers face issues with the manufacturing efficiencies, causing troubles at client end.

Challenges

  • Excessive downtime
  • Inconsistent throughput
  • Rising operational costs.

Project Milestones

  1. Conducting a full diagnostic of supplier production floor using real-time data logging
  2. Workflow mapping, and operator interviews.
  3. Identifying Key inefficiencies in changeover times, machine maintenance scheduling, and inventory flow.

Our Solution

  • Implemented Lean manufacturing principles
  • Introduced a predictive maintenance system
  • Optimized layout for smoother material flow
  • Trained frontline staff in process standardization

Results

  1. 28% increase in overall equipment effectiveness (OEE)
  2. 22% reduction in unplanned downtime
  3. 18% drop in per-unit production costs
  4. Average product cycle time reduced by 1.5 hours