Introduction
A major OEM was looking to develop the new suppliers in India & wanted to outsource the entire process as they were having constraint on resources
Challenges
- Tight Timeline
- Scattered Locations
Project Milestones
- Supplier identification
- Suppliers Audits
- Supplier Shortlisting
Our Solution
Catalydd’s structured approach included:
- Catalydd carried out the Suppliers assessment in terms of Infra structure & systems as per VDA 6.3 standard
- Catalydd helped to close the Gaps/ NC found in audit by extensive trainings & support
- Catalydd installed a team of Supplier Quality Engineers.
- Our engineers studied the process required to manufacture the part & also assembly installation in details
- We have carried out reviews of checking fixture, tools & implemented CAPA & 8D
- Desired results were achieved as per Quality Norms.
- PPAP was conducted & signed-off as per AIAG norms for all components
Results
- Identified 24 suppliers in Acceptable zone
- Another 11 suppliers are Conditionally Accepted.